Recent projects

A selection of recent projects delivered for wind developers, investors, and consultancy partners.

Expert Witness - Vessel dispute

Aug / Sept 2026

For Diales

Wind turbine installation vessel dispute

Expert Witness Installation
Diales logo

Expert Witness - Bolted flange issues

Aug 2026 (ongoing)

For Diales

Bolted flange issues at a cold-climate wind farm

Expert Witness Technical Advisory
Diales logo

Cost Modelling - LCoE and IRR Calculations

Aug 2026

For Wind Farm Client

LCoE and IRR Calculator to stress-test project economics

LCoE Modelling IRR Calculations

Expert Witness - Blade-tower strike

Jul 2026 (ongoing)

For HKA

Blade-tower strike for an onshore wind farm

Expert Witness
HKA logo

Onshore WTG TDD

May - Jul 2026

For Wood

Technical due diligence of the Enercon E-175 EP5 E2 for an onshore wind farm in Canada

TDD Due Diligence Onshore
Wood logo

Chinese WTG OEM Market Study

May 2026

For ERM

Independent, objective view for a confidential client new to wind — technical comparison against western OEMs, performance trends, market-entry hurdles and bankability challenges.

OEM Review Turbine TDD Market Study
ERM logo

Cost Modelling & Benchmarking - DEVEX

Jan 2026

For Natural Power Consultants

DEVEX benchmarking study for a portfolio of UK and German OWFs

DEVEX Cost Modelling Benchmarking
Natural Power logo

WTG Technical Support

Apr - May 2025

For Venterra – confidential client Korea

WTG package support for a Korean offshore wind project, including ER/ITT drafting, technical and commercial bid evaluation of Siemens, MingYang and Vestas, and review of power curve, availability warranties, testing regimes and associated LDs.

Bottom-fixed
Venterralogo

WTG Package Support

Jan 2025 - Apr 2026

For Hyundai Yokji OWF / Doris — WTG Package Engineering Support

Independent assessment of OEM proposals with price benchmarking; HoTs, TSA, and SMA schedule reviews; EWA drafting inputs; tender evaluation matrix with red-flag analysis of key terms.

Contract Review EWA Drafting Tender Evaluation Red Flag Analysis
Doris logo

TDD & Bankability - MySE 18.5-260

Dec 2025 - May 2026

For Natural Power Consultants - European Wind Farm Client

Technical due diligence including factory, prototype and certification body visits in China; PSA/HoTs reviewed against lender expectations, plus climbing & inspection of the prototype turbine and a cyber-security risk assessment.

OEM Review Turbine TDD Site Visit
Natural Power logo